BCT - Route 18
Effective May 28, 2013
BCT Route 18 will end at Turtle Creek Blvd and US-441. A temporary “shuttle” service will be added between Turtle Creek Blvd and Sandalfoot Blvd.
- Shuttle will start @ Turtle Creek Blvd. & US 441 (Hess Station) NORTHBOUND & SOUTHBOUND.
- Service every 34 minutes on weekdays, every 44 minutes on Saturdays. NO SUNDAY SERVICE.
- Northbound passengers will be issed a "free" transfer to board the shuttle route; SOuthbound passengers will be issued a "free" transfer to board BCT Route 18 bus.
For more information visit the BCT website @
www.broward.org/bct or call BCT Customer Service @ 954-357-8400.
Route 2, Route 33, Route 49
Effective May 6, 2013 until Completion of New Construction of Palm Beach Outlet Mall
Due to the construction at the Palm Beach Mall and the closure of JC Penny and Firestone Complete Auto Care, Routes 2, 33 and 49 will no longer serve the JC Penny bus stop and will be temporarily re-routed as follows:
Route 2
Northbound from Palm Beach Lakes Blvd.: RIGHT on Congress Ave to regular route.
(Temporary transfer point will be Bus Stop #860 on Palm Beach Lakes Blvd @ Congress Ave)
Southbound from Congress Ave.: LEFT on Palm Beach Lakes Blvd to regular route.
(Temporary transfer point will be Bus Stop #604 on Palm Beach Lakes Blvd @ Congress Ave.)
Route 33
Northbound from Palm Beach Lakes Blvd @ I-95: CONTINUE East, passing Palm Beach Mall to regular route.
(Temporary transfer point will be Bus Stop #604 on Palm Beach Lakes Blvd @ Congress Ave.)
Southbound from Palm Beach Lakes Blvd @ Congress Ave.: CONTINUE west, passing Palm Beach Mall to regular route.
(Temporary transfer point will be Bus Stop #860 on Palm Beach Lakes @ Congress Ave.)
Route 49
Eastbound from Congress Ave @ Executive Center Dr.: CONTINUE on Congress Ave to Presidio, RIGHT on Presidio Place, LEFT on Executive Center Drive, AROUND cul-de-sac, CONTINUE on Executive Center Drive to Right on Palm Beach Lakes Blvd to regular route.
(Tenmporary transfer point will be Bus Stop #604 on Palm Beach Lakes Blvd @ Congress Ave)
Westbound from Palm Beach Lakes Blvd & Executive Center Dr.: LEFT on Executive Center Dr, LEFT on Congress Ave, RIGHT on Presidio Place, LEFT on Executive Center Dr, AROUND cul-de-sac, CONTINUE on Executive Center Dr, LEFT on Congress Ave to regular route.
(Temporary transfer point will be Bus Stop #860 on Palm Beach Lakes Blvd @ Congress Ave.)
NOTE: Bus will only serve Bus Stops on the SOUTH SIDE of Presidio Place, and the NORTH SIDE of Executive Center Dr between Presidio Place & Congress Ave.
Route 60
Effective May 6, 2013 (for approximately 2 weeks)
Due to construction on 57th Ave and 38th Court, Palm Tran will use the following detour:
Eastbound: Not affected.
Westbound from 57th Ave.: LEFT on S 37th Ct., RIGHT on S 55th Ave., RIGHT on S 38th Ct., LEFT on S 57th Ave. back on regular route.
Route 1
Effective Immediately (April 19, 2013)
Due to ongoing construction on US1 from Silver Beach Rd. to the Post Bridge, Palm Tran is offering "flag service" for this portion of the route.
Passengers being picked up along the construction may "flag" the bus to stop if there is no bus stop location in place. Palm Tran Bus Operators will only stop if it is safe to do so. Passengers will be picked up and dropped off at other locations along this portion of the route besides at bus stops as long as the bus can safely board and alight passengers.
Route 1
Effective April 22, 2013
Effective April 22, 2013, Palm Tran will discontinue the Route 1 Limited-Stop Service pilot bus that we have been offering. Based on this pilot-program and feedback from passengers, Palm Tran will soon offer a new option for Route 1 riders.
Palm Tran will be offering limited-stop bus service on Route 1 during several morning and afternoon peak times in addition to regular service. Our plans are to offer limited-stop service on weekdays to help improve on-time service to and from the Intermodal Transit Center, a transfer point to 8 other routes. Limited-stop buses serve fewer stops in order to complete the route in less time. Stay tuned for the Route 1 Limited-Stop Service schedule and set stops to start on May 13, 2013. (Click HERE for the PDF Announcement)
Route 41
Effective March 4, 2013
Due to weight limits and the pending closure of Flagler Memorial Bridge, Route 41 will use the Royal Palm Way (middle) bridge on all trips.
Route 62
Effective 8/23/2012
Due to construction, Route 62 is UNABLE to serve LAKE WORTH BEACH on Sundays. Weekday and Saturday schedules remain unchanged. This only affects SUNDAY service.
Last updated :
05/20/2013